Two parallel bridges, five spans each, and over 300 meters to cross. Built as part of Highway 410, the new structures span the Massawippi River, a railway line, and Winder Street. Their construction required a wide range of expertise, from deep pile foundations to the installation of the steel structure and the pouring of the concrete decks.
Results
The two new structures now allow Highway 410 to cross several major obstacles along a single route. The planning and prefabrication work carried out in advance made it possible to realize the unique geometry of the decks and bring to life two major structures integrated into the Eastern Townships road network.